A restaurant build-out in Florida needs approval from the state and from the city or county. The state food regulator signs off on the kitchen plan and the license. The local offices handle the building permit, fire review and grease rules. Send a request here and a general contractor that serves your ZIP code gets it.
What a build-out job covers
A contractor takes a space from shell or old tenant to a kitchen an inspector can pass. That means walls, floors, plumbing, electrical and the hood and fire systems, built to the drawings the permit office approved. Some contractors also help assemble the permit package.
When DBPR plan review applies
The state's plan review comes first for most food service projects. DBPR asks for it when a space is new, changes use, is remodeled, or has sat closed for 18 months or more. A menu change that needs different equipment also triggers it.
The package is simple: an application, a floor plan drawn to scale with equipment labeled, and a sample menu. DBPR says online applications are reviewed within 30 days, and approved plans stay valid for 18 months.
Get prices for this job. Send one request and pick how many local companies quote it.
Get quotesThe order approvals tend to come in
Zoning comes first, to confirm a restaurant is allowed in the space. Next come the DBPR plan and the building permit. The fire marshal reviews hood suppression, extinguishers and exits, and the utility weighs in on the grease trap and seating limits.
Building can start in parts before every review ends. Florida law lets a building department permit early work at the holder's own risk, so ask the office what it allows.
Things only a build-out has to settle
The hood system must pass a performance test before final approval. The test checks exhaust airflow, makeup airflow and whether smoke or steam is captured. Schedule it early, because a failed test holds up the final inspection.
You also cannot serve customers right after construction ends. Wait for the DBPR licensing inspection and the temporary license, and keep the building, electrical, fire and plumbing approvals on site for the inspector.
What to ask a contractor
Ask who pulls the permits and who orders the hood, duct and suppression drawings. Ask which work the contractor does itself and which goes to licensed subcontractors. Florida makes it a crime to do contracting work without the right license, so ask for license numbers and look them up.
What to have ready when a company calls
Have the lease or property address, a floor plan or sketch, and the equipment list. Know your target opening date and whether the building uses a septic system, since that needs health approval first.
Questions
Do I need DBPR plan review for a restaurant remodel?
Yes, a remodel needs DBPR plan review, and so does a menu change that calls for different equipment. A licensed space with no changes does not need it.
Can construction start before the plans are approved?
DBPR says plans must be approved before construction or remodeling. Your building department may allow limited early work at your risk, so check with both offices first.
Who approves the fire suppression system in a new kitchen?
The local fire marshal approves it, and a company licensed by the State Fire Marshal must install it. Ask the fire marshal's office what it wants to see before final approval.